Return to site

SUEZ ANGERS

Enwise provided a containerized solution to Suez group for a pilot project in Angers, France. The project has been exported and implemented on-site since March 2025 and expected to achieve full operation in June.

broken image

The proposed unit includes:
- A shredding unit as an option. This shredder will be integrated in a hopper system.
- A dry anaerobic digestor integrated in a 45’’ shipping container. The digestor includes a feeding system and recirculation systems.
- A biogas desulphurization unit from the dry anaerobic digestor and from a secondary digestion.
- A screw impeller pump toextract digestate after the dry anaerobic digestion, as an option.
- A phase separation unit toremove contaminant after digestion. The phase separation unit is composed of 2 hydraulic presses.

broken image